RootMutationType Object
Fields
#
approveAssignment
Approve a pending project assignment. When a project member whose own
role is "member" or "only_my_work" adds someone to a project, the
assignment is created with pending: true and must be approved by a
project admin or workspace admin before it becomes active. Pass the
project-level assignment's id; the user's pending todo assignments
in the project are approved together with it.
On approval the assignments are activated, the inviter and the invitee are notified by email, and the approved user is added to the project's workspace (with no workspace permissions) if not already a member.
The caller must be a project admin or workspace admin. Returns true
on success; calling it on an already-active assignment, on a
todo-level assignment, or without sufficient access returns an
unprocessable_entity error. Use denyAssignment to reject instead.
associateColorTag
Attaches an existing ColorTag to a Todo or RecipeTodo. id is
the ColorTag id, not the task id; pass exactly one of todoId
or recipeTodoId. The tag must belong to the task's own Project
or Recipe — tag sets are scoped per Project and per Recipe, and
cross-container associations fail with not_allowed.
Attaching the special Milestone tag converts the task into a
milestone: a Todo's startDate and duration are cleared, its
dependenciesType becomes "finish-to-finish", and project
progress is recalculated (a RecipeTodo only loses duration).
Requires update permission on the target task — a user assigned
to the Todo, a Project Admin, Stack Admin, or Workspace Admin;
on the Recipe side, update access to the Recipe. Returns the
ColorTag. Detach with disassociateColorTag.
createAssignment
Assign a user to a todo, a project, a stack, or in bulk to every todo
in a slice. The target id on assignment selects the mode: todoId
(single todo), projectId (project membership with a role),
stackId (stack admin, role "stack_admin"), or sliceId together
with projectId (bulk: one todo assignment per todo in the slice the
user is not yet assigned to). userId is always required, and role
(the project permission, see the field) is required for a project or
stack; pass id as the string "new". Duplicate assignments for
the same user and target are rejected.
Assigning a user to a project todo also puts them on the project if
they are not on it yet, returned as projectAssignment. Someone
already on the project keeps their project permission whatever
role is sent; a new person gets role, or "member" when it is left
out. Which project permission (role) the caller may grant depends on their own
access: "only_my_work" is always allowed; "member" requires the
caller to be a project member other than "only_my_work" (or a
workspace admin or viewer); "admin", "admin+autoassign", and
"member+invite" require project update rights (project admin,
workspace admin, or stack admin). When the caller's own role on the
project is "member" or "only_my_work", the assignment is created
with pending: true and project admins are emailed approve/deny
links (see approveAssignment and denyAssignment); otherwise the
assigned user is notified directly. For todo assignments,
notificationSent reports whether the assignment email was sent
(suppressed when the assignee disabled assigned-to-task emails).
Access control: workspace admins always qualify; project targets also
accept any user assigned to the project, todo targets accept project
admins and users assigned to the todo, stack targets accept the
stack's admins. Returns AssignmentResult with assignmentId
(single) or assignments (bulk). Exceeding the rate limit (50 single
or 5 bulk creates per ten minutes; for an organization access token,
500 single and 50 bulk) is reported through message rather than a
GraphQL error.
createBox
Creates a single box inside a project slice. A Box is a container for
todos within a slice; when the slice's boardView flag is true, its
boxes render as board columns. The new box is always created with
done: false.
The caller must be allowed to create todos in the slice's project: a
workspace admin, or a workspace member assigned to the project as
admin, admin+autoassign, member, or member+invite (members
with the "only_my_work" role cannot manage boxes).
Returns the created Box; fails with not_found when the slice
does not exist and not_allowed when the caller lacks permission.
The box, the moved todos, and the slice's boardView change are
saved together: if one of them fails, none of them is saved. To
create several board columns at once and turn the slice into a
board, use createBoxes instead.
createBoxes
Creates several boxes at once and turns the slice into a board
(sets the slice's boardView flag to true) - the "create board"
flow. One box is created per entry in titles, positioned in list
order; a box titled exactly "Done" is automatically flagged
done: true (the board's done column). The standard board uses
["Not Started", "In Progress", "Done"], but any titles are
accepted.
Fails with not_allowed when the slice is already a board with
existing boxes, or when the caller lacks permission to create todos
in the slice's project. Returns the created boxes. To add a single
box use createBox.
createPost
Creates a Post — a discussion entry attached to a Project,
Recipe, Slice, or task. type sets the kind: "message" (team
conversation), "idea" (improvement suggestion), "issue"
(issue/risk tracking), or "reply". For issues, secondaryType
distinguishes "Issue" from "Risk" and priority ranks it; these
carry no meaning on other kinds. open is required on every
call — pass true for non-issue Posts; passing open: false
records the close timestamp internally (not exposed as a field).
A top-level Post attaches to exactly one container: pass exactly
one of projectId, sliceId, todoId, recipeId,
recipeSliceId, or recipeTodoId (zero or several fails with
not_allowed). To reply to an existing Post, pass postId
instead — the reply inherits the parent's container
automatically. ownerId assigns the Post to a user; when the
owner differs from the author, the new owner is notified by
email. User mentions written in content (the UI's @-mention
markup) are recorded against the Post.
Post content is plain text. Line breaks are kept.
HTML is not rendered, so tags such as <p> or <strong> would
show up as literal text. (A task's description is different —
it takes HTML.)
The caller needs view access to the target container — or, for
replies, must be the parent Post's author, owner, or a mentioned
user, or have access to the parent's container. Returns the
created Post. Issue Posts also feed the Project's status
indicators.
createProject
Create a new project in a workspace. Only title and workspaceId are
required; the caller must hold the "admin" or "project_creator" role in
that workspace. Personal workspaces never allow projects — attempting
one fails with "workspace_id not allowed - personal workspaces do not
allow projects. You can create todos directly at the workspace level
instead".
Two creation modes are useful to API callers: a plain call (no
recipeId) creates the project with a single unnamed slice so tasks
can be added right away, and recipeId instantiates the full structure
of a recipe template. The aiData and aiPromptData arguments are
reserved for Pie's in-app Create-from-AI flow and should not be
populated by external callers — an AI assistant that wants an AI-generated
project should design the structure itself and create it with
createProject and its slices list (or saveProjectSlices afterwards),
followed by createTodo. The caller is automatically assigned as project
admin unless assignments contains an explicit self-assignment with
another role; the API User of an organization access token is never
assigned. startDate
and endDate are stored exactly as given (they are never derived from
task dates), and title must not contain a URL.
Returns the created project. Validation failures return a list of
"field message" error strings. Rate limit: one user (or one
organization access token) can create at most 50 projects per 10
minutes. See also updateProject,
saveProjectSlices, createTodo, duplicateProject.
createStack
Creates a Stack — the portfolio-level grouping of Projects within a
Workspace (Stacks apply to Projects only, not Recipes). title and
workspaceId are required; description is an optional free-text
note.
The optional assignments list attaches additional users to the
Stack at creation time; the only meaningful role value is
"stack_admin". A Stack Admin can view and update the Stack (and
view its Projects) even without being a Workspace admin. The
Stack Admin list cannot be edited through updateStack afterward.
The calling user must be a Workspace admin or have the
project-creator permission in the target Workspace; otherwise the
mutation fails with a "not_allowed" error. Returns the created
Stack (initially empty). Add Projects to it afterward with
moveStackProject.
createTextTag
Creates a text tag — a ColorTag with no color, typically used as
a filter keyword — and attaches it to a Todo or RecipeTodo in
one call. name is the label; pass exactly one of todoId or
recipeTodoId. The tag is scoped to the task's own Project or
Recipe, derived from the task (there is no projectId/recipeId
argument). If a text tag with the same name already exists
there, it is reused instead of duplicated.
Requires update permission on the target task — a user assigned
to the Todo, a Project Admin, Stack Admin, or Workspace Admin;
on the Recipe side, update access to the Recipe. Returns the
ColorTag with color null. Text tags are deleted
automatically when their last association is removed via
disassociateColorTag.
createTimeEntry
Logs time into one day cell of a Timesheet row (a TimeItem).
Pass timeItemId (the parent row), date (the day the time
applies to), and seconds (time is stored in seconds; the UI
renders hours and minutes). With planned: true the value is
stored as planned effort (plannedSeconds); otherwise as actual
time worked (seconds). A day cell can carry both tracks
independently.
A row has one TimeEntry per day. The first call for a day creates
it; later calls for the same day add their seconds to it, and a
planned value replaces the day's plan. With externalId (the
sender's own id for these hours, for example a Jira work log id),
hours sent again with the same id replace what that id sent
before instead of adding to it. To change a logged value directly,
use updateTimeEntry; setting it to 0 removes the hours.
Without userId the parent row must belong to the calling user.
Pass userId to log time on another user's row; the caller must be
that user (with view access to the Todo on a Todo row), someone
with update permission on the Project (Project Admin, Stack Admin, or
Workspace Admin) on a Todo or Project row, or an admin of the
organization on a Non-Project Activity row. Returns the day's TimeEntry; unauthorized calls fail with
not_allowed.
createTimeEntryPlanned
Creates a planned-effort TimeEntry on a Todo-backed Timesheet
row and recalculates the Todo's planned work distribution.
userId and a Todo-backed timeItemId are required at runtime
despite the nullable schema typing. Pass planned: true to
store seconds as planned effort; omitting planned stores the
value as actual time instead, with no recalculation. With
planned: true and seconds omitted, the entry is flagged
redistributed so its planned value is derived from the Todo's
work-effort distribution.
When the entry's date falls inside the Todo's start–due range,
planned effort is recalculated across the Todo and every
affected Timesheet row is returned; otherwise only the parent
row is returned. The return type is [TimeItem] (rows, not the
entry) — use createTimeEntry if you need the created
TimeEntry back.
The caller must be the row's owner (their own userId, with
view access to the Todo) or have update permission on the Todo's
Project (Project Admin, Stack Admin, or Workspace Admin).
createTimeItem
Creates a TimeItem — one row on a user's weekly OMP Timesheet,
scoped to a single target. Select the target with the arguments:
projectId for a Project-level row, todoId for a Task-level
row, or organizationId plus nonProjectActivity (a free-text
label) for a Non-Project Activity row. date places the row in
its timesheet week (the Timesheet groups rows Sunday through
Saturday). The row itself carries no hours — populate day cells
afterwards with createTimeEntry, or createTimeEntryPlanned
for planned effort.
By default the row is created on the calling user's own
timesheet; for the caller's own Todo rows, an existing
soft-deleted row for the same Todo and date is restored instead
of duplicated. Pass userId to create a row on another user's
timesheet, for a Todo, a Project or a Non-Project Activity; the
caller must be that user (with view access to the Todo on a Todo row), someone
with update permission on the Project (Project Admin, Stack Admin, or
Workspace Admin) on a Todo or Project row, or an admin of the
organization on a Non-Project Activity row.
tags sets organization-managed reporting labels (for example
"Billable") on the row; new tag names are also added to the
organization's tag list. Returns the created TimeItem. Passing
none of projectId, todoId, or organizationId fails with
not_allowed; validation failures (such as a duplicate
Project-level row for the same date and tags) return a list of
"field message" strings. Time tracking is an Enterprise-plan
feature.
createTimeItems
Bulk variant of createTimeItem: creates several Timesheet rows
for the calling user in one call. Pass projectIds for
Project-level rows or todoIds for Task-level rows; if both
lists are supplied, only projectIds is processed. date
places every created row in the same timesheet week.
Rows are created only for Projects or Todos the caller has an
Assignment on — other ids are silently skipped, not errors. If a
matching row already exists for the same target and date it is
reused (and restored if soft-deleted) instead of duplicated.
tags applies the given organization reporting labels to every
created row.
Returns the list of created or reused TimeItem records (an
empty list when neither id list is given). Day-cell hours are
not created here; call createTimeEntry per date afterwards.
createTodo
Creates a todo (task). Two placements exist. Project todos: pass
todo.sliceId for the target project slice, optionally with
todo.boxId for a box in that same slice (the box must belong to
the slice). Do not pass a projectId; the project association is
inferred from the slice. Standalone todos: omit sliceId and pass
todo.workspaceId - allowed only in the caller's personal
workspace; other workspaces reject standalone todos with an
explanatory validation error.
Creating a project todo requires the caller to be a workspace admin
or a workspace member assigned to the project as admin,
admin+autoassign, member, or member+invite. Pass todo.todoId
to create the todo as a subtask: it inherits the parent's
assignments and roles, and the parent's own dates, duration, and
progress are cleared (parents derive them from subtasks). The
creator is auto-assigned to standalone todos and, unless they are a
project admin, to project todos. todo.workEffort is ignored on
create and defaults to 8 hours (28800 seconds); change it with
updateTodo. When startDate/dueDate fall outside the project's
date range, the project dates are expanded to cover them.
Returns TodoMutationPayload: select todoId or todo, plus
assignments and the recalculated progress, slices, and boxes
aggregates. Validation failures return error messages of the form
"field message".
createWorkspaceUser
Add a person to a workspace by creating a WorkspaceUser membership.
Identify the person with workspaceUser.userId (existing user) or
workspaceUser.user (email plus optional profile fields). An email
matching no account creates a placeholder user and sends an invite
email with a sign-up link; an email matching an existing account adds
that account directly. Pass workspaceUser.id as the string "new";
duplicate memberships in the same workspace are rejected.
permissions may contain "admin", "project_creator",
"recipe_creator", "viewer", "internal_rates", and
"billing_rates"; unknown values are dropped and "admin"
supersedes the creator/viewer values. Granting any permission
requires workspace admin or organization admin rights.
hourlyBillingRate and hourlyInternalRate set the member's default
rates in cents. The optional todoId, projectId, stackId, or
recipeId argument supports adding someone from within that context;
the caller then needs assignment-creation rights there instead of
workspace-level rights. Every supplied context must be authorized and
belong to the requested workspace. Explicitly supplied rate fields,
including zero or null, require the corresponding billing_rates or
internal_rates permission together with a workspace admin or viewer
role, or organization admin. Project administration alone does not
grant these rates. Omitting rate fields does not require rate
permissions. Invalid creation commands leave no partial invitee
account or membership.
Without a context argument the caller must be a workspace admin or
viewer, or an organization admin. On free and trial organizations the
call fails with the error "max_users_per_organization_reached" once
20 distinct users exist across the organization. Returns the created
WorkspaceUser.
deleteAssignment
Delete one or more assignments. The input shape selects the mode:
assignment.id deletes a single assignment; assignmentIds plus
projectId deletes the listed assignments; sliceId plus
projectId deletes every assignment on every todo in that slice.
Both bulk modes require update access to the project and report the
deleted records in assignments.
Deletes are hard deletes with cascades and safeguards: removing a
project-level assignment also removes that user's todo assignments
within the project, and removing the project's last "admin" or
"admin+autoassign" assignment, or a stack's last "stack_admin",
is rejected. Removing a todo assignment cleans up the user's empty
time entries on the todo and redistributes work effort to the
remaining assignees; deleting the last assignment of a personal
(no-slice) todo deletes the todo itself, and when a personal-
workspace todo changes ownership as a result, the new workspaceId
is returned.
For single deletes, users may always delete their own assignments;
otherwise the updateAssignment access rules apply (workspace admin,
project admin, or todo assignee for todo assignments). Returns
AssignmentResult.
deleteBox
Deletes a box. The deleteTodos argument selects one of two
distinct behaviors. With deleteTodos: true the box and all of its
non-deleted todos are soft-deleted together and can be restored with
undoDeleteBox. With deleteTodos: false or omitted, the box
record is deleted permanently and its todos are kept: they lose
their boxId and become loose todos directly on the slice - this
path cannot be undone.
If the slice is a board and this was its last remaining box, the
slice's boardView flag is reset to false.
Access control matches createBox (permission to create todos in
the box's project). Returns the deleted Box; fails with
not_allowed when the caller lacks permission.
deletePost
Soft-deletes a Post by setting deletedAt; the Post disappears
from queries but is not destroyed, and there is no undo
mutation. Only the identified Post is marked deleted — its
replies are not modified. Permitted callers match updatePost:
the author, the current owner, anyone with update permission on
the Post's Project (Project Admin, Stack Admin, or Workspace
Admin), or — for Recipe-side Posts — anyone with access to the
Recipe. Returns the deleted Post. id is required at runtime
despite the nullable schema typing.
deleteSlice
Soft-delete a project slice and optionally its contents; reversible
with undoDeleteSlice. The three booleans control the scope:
deleteSlice: true deletes the slice itself, while false or omitted
keeps the slice and only marks its content as deleted (clear-slice
behavior). deleteTodos: true additionally soft-deletes all tasks in
the slice, and deleteBoxes: true soft-deletes the slice's boxes —
deleteBoxes only takes effect when deleteTodos is also true.
Project progress is recalculated when tasks are deleted.
Requires task-create permission in the project: workspace "admin"
role or a project role of "admin", "admin+autoassign", "member", or
"member+invite". Returns the slice with its todos and boxes,
which supplies the ids needed for undoDeleteSlice.
deleteStack
Permanently deletes a Stack by id. Only the Stack record and its
Stack admin assignments are removed; the Projects that were
grouped under it are detached (their Stack reference is cleared)
and remain unchanged in the Workspace. There is no undo for this
operation.
The calling user must be an admin of the Stack's Workspace or a
Stack admin assigned to the Stack; otherwise the mutation fails
with "not_allowed" ("not_found" for an unknown id). Returns the
deleted Stack.
deleteTimeItem
Soft-deletes a Timesheet row owned by the calling user; other
users' rows cannot be deleted through this mutation. Pass the
TimeItem id (required at runtime despite the nullable schema
typing).
For Project-level and Todo-level rows the soft delete applies to
all of the caller's TimeItems for that same Project or Todo
across every week, not only the row identified by id.
Non-Project Activity rows are removed individually. Logged
TimeEntries are not destroyed — the rows are hidden by setting
deletedAt, and creating a row again for the same Todo and date
via createTimeItem restores the original record. Returns the
deleted TimeItem.
deleteTodo
Soft-deletes a todo and all of its subtasks: deletedAt is set and
the records disappear from list queries, but they remain restorable
with undoDeleteTodo (no retention limit). Any Jira link (jiraId)
is cleared and is not restored on undo. This mutation never
hard-deletes; the only hard-delete path for todos is the move flow
(copyTodosFromLocation with copyTodosOptions.move: true).
Permission matches updateTodo (workspace admin, project admin, or
assigned to the todo); inaccessible or unknown ids fail with
not_found.
Returns TodoMutationPayload with the deleted todo (deletedAt
set) and recalculated progress, slices, and boxes aggregates.
To clear a whole slice or box at once use deleteTodos.
denyAssignment
Reject a pending project assignment; the counterpart to
approveAssignment. Pass the project-level assignment's id. The
pending assignment and the user's pending todo assignments in that
project are deleted, and the inviter is notified by email.
The caller must be a project admin or workspace admin on the project.
Returns true on success; calling it on an already-active assignment
or a todo-level assignment returns an unprocessable_entity error.
disassociateColorTag
Detaches a ColorTag from a Todo or RecipeTodo. id is the
ColorTag id; pass exactly one of todoId or recipeTodoId.
Other tasks wearing the same tag are unaffected. Color-variant
tags remain in the Project's or Recipe's tag set, but a text tag
(one with no color) is deleted entirely once its last
association is removed. Requires update permission on the target
task, mirroring associateColorTag. Returns the ColorTag;
fails with not_allowed if the task is inaccessible or does not
belong to the tag's Project or Recipe.
me
Returns the profile of the currently authenticated user. This is the recommended first call for any AI assistant or API session: it identifies who is logged in and returns the user's id, firstName, lastName, email, and linked organizationUsers and workspaceUsers. Use organizationUsers and workspaceUsers to navigate the user's available organizations and workspaces before making further queries.
moveBox
Moves a box, together with all of its todos, to another slice of the
same project; cross-project moves are rejected with not_allowed.
position sets the box's position in the destination slice. If the
destination slice had loose todos and no boxes, a box titled
"(Rename Box)" is created automatically to hold them. Requires
permission to create todos in the project. Returns a list with the
moved box, plus the auto-created box when one was made.
moveBoxToDoneSlice
Archives a finished board column (the "mark sprint as finished"
action). Finds or creates a slice titled "Done Sprints" directly
after the box's slice, creates a box there titled with the current
date (e.g. "6/11 Done"), and moves every todo from the given box
into it; the source box stays in place, now empty. Todos flagged
recurring are additionally recreated as fresh copies (with files,
roles, assignments, tags, and data-field links) in the first box of
the source board. Requires permission to create todos in the
project; fails with not_allowed when the box has no todos or
already sits in the "Done Sprints" slice. Returns the affected
boxes: the source box, the new dated box, and a "(Rename Box)" box
when one was auto-created for loose todos in the Done Sprints slice.
moveStackProject
Move a project into a stack, between stacks, or out of its stack. Pass
stackId to add the project to that stack (it is appended at the last
position); omit it or pass null to remove the project from its current
stack. The stack must belong to the project's workspace —
cross-workspace moves are rejected. Adding requires Workspace Admin or
direct Project Admin permission, plus access to the target stack through
Stack Admin or workspace create-project permission. Removing requires
Workspace Admin or workspace create-project permission. Moving between
stacks requires both. Inherited Stack Admin permission alone does not
authorize adding projects. Returns the updated
project. See also reorderStackProjects.
ompTodos
Returns the tasks (Todos) assigned to the current user across all their
workspaces — the data that powers Pie's On My Plate (OMP) page. The
result combines two flavors of tasks the user is responsible for:
standalone OMP tasks (todos with no project slice — these live in
the user's personal workspace, the only place where new standalone
todos can be created, plus any slice-less todos assigned to the
user) and project tasks (todos belonging to a slice of any
currently-open project in a workspace the user can access). The
filters.name argument
selects a date window and is matched case-sensitively — accepted
values are "Late", "Next 7 days", "Weeks", "Custom days:", and
"Personal tasks with no dates". For "Weeks" and "Custom days:" also
supply filters.start and filters.due.
"Today" is the server's current UTC date. "Late" returns incomplete
tasks (progress below 100) whose due date is before today, excluding
tasks snoozed to today or later. The date windows match a task whose
date span overlaps the window: the span runs from its start date to
its due date, a task with only one of the two dates matches when that
date falls inside the window, and a snooze date replaces the start
date and extends the due date. "Next 7 days" covers today through the
sixth day after it; "Weeks" and "Custom days:" cover filters.start
through filters.due, both inclusive. "Personal tasks with no dates"
returns standalone tasks without a due date. Only "Late" excludes
completed tasks; filter the other windows on progress if you only
want open work.
Only "Late" is paginated: 10 tasks per page, most recently due first,
with total counting every late task and pages past the end
returning an empty list. Every other filter returns all matching
tasks on every page, with total equal to that count, so request
page 1 only. Use this query for "my work" across the whole
account; use projectTodos when you need every task of a single
project (which has no userId filter).
projectTodos
Returns the tasks (Todos) in a single project that the calling user
is permitted to view. Visibility is based on the user's assignment
to the project: a member assigned with any role other than
"only_my_work" receives every task in the project; a member with the
"only_my_work" role receives only the tasks directly assigned to
them; a user with no assignment to the project — including workspace
admins — receives an empty list rather than an error. An
Organization Access Token receives every task in the project.
Results are ordered by slice position, then box position, then task
position.
Soft-deleted tasks are excluded; completed tasks are included. The
Todo progress field (integer 0–100, nullable) is the only
completion signal — progress >= 100 means done, nil means not
started. Filter client-side on progress if you only want open
work. There is no separate closed boolean on Todo.
Subtasks are not nested in the response: if a Todo references a parent, both appear as separate top-level items. Use this query for the task list of one project; use projectsTodos when you need tasks across multiple projects filtered by due date.
projectsTodos
Returns todos across the specified projects that are either due on
or before the given dueDate, or whose startDate is on or before
the dueDate. A todo is included when at least one of its dates is
set and falls on or before the cutoff; todos with neither date set,
or whose set dates all fall after the cutoff, are excluded.
Completed todos are included in the result; if the caller wants
only open work, they must filter client-side on the Todo's
progress field (progress >= 100 = done).
Access control is applied per project: a project from projectIds
contributes todos only when the calling user is a member of its
workspace and additionally is a workspace admin, holds a project
role of admin or admin+autoassign, or is assigned to the
project's parent Stack. Projects that fail this check are silently
skipped rather than raising an error. Pie's OMP Tasks "Teams
Plate" view uses this query for cross-project deadline planning.
Use projectTodos instead when you need the full task list for a single project without date filtering.
refreshProjectPlannedWorkEffort
Recompute planned work effort for every assigned task in the project.
For each task assignment the work effort is re-derived from the task's
workEffort, or 8 hours per day of duration, or the task's date
range, and planned time entries are rebuilt for tasks that have dates.
This is a maintenance/recompute entry point; normal task edits keep
these values up to date automatically. Requires project update
permission. Returns the project.
reorderBoxes
Reorders the boxes of one slice. ids is the full desired order of
box ids in sliceId; positions are assigned by list index, and ids
that do not belong to the slice are ignored. The optional id
identifies a box dragged in from another slice of the same project:
it is first moved into sliceId (same logic as moveBox), then
placed according to ids, or appended last when absent from ids.
Requires permission to create todos in the slice's project; returns
the reordered boxes, or not_allowed on missing permission.
reorderOmpTodos
Persists the display order of the calling user's On My Plate (OMP)
list. ids is the full desired todo-id order; it is stored on the
user's personal workspace, applies to that user only, and persists
across sessions. Always returns true.
reorderProjectTodos
Reorders todos inside one project slice. ids is the desired order
for the slice: positions are assigned by list index, ids outside the
slice are ignored, and unlisted todos keep their positions. The
optional pickedUpTodo applies the dragged task's location transition
in the same call (for example when a drag changes its box or progress).
Other task changes use updateTodo. Requires permission to update the
slice's project, or a team member moving a task assigned to them
(movedTodoId); otherwise fails with not_found. Returns true.
reorderStackProjects
Reorders the Projects within a Stack. ids is the desired full
ordering of the Stack's Project ids; each listed Project is given
its position from the list, and ids that do not belong to the
Stack are silently ignored. The optional projectId first moves
that Project into the Stack (it must be in the same Workspace and
the caller must have the permissions documented by moveStackProject)
before positions are applied atomically; a denied move changes no positions —
this supports drag-and-drop of an outside Project into the Stack.
The calling user must be an admin of the Stack's Workspace or a
Stack admin. Returns the Stack.
saveProjectSlices
Create, update, and delete project slices in one call — this is a
full-replace operation on the project's slice set. Entries with an
id update that slice, entries without an id create a new slice,
and any existing slice whose id is NOT in the submitted list is
permanently deleted (a hard database delete, not recoverable with
undoDeleteSlice). Always send the complete current set of slices
you want to keep.
Each entry requires title and position (ordering within the
project, starting at 1). Requires project update permission; an
unknown or inaccessible projectId returns a not_found error.
Returns the slice ids in the same order as the input, so callers can
correlate created slices with their entries.
saveWorkspaceUser
Upsert a workspace membership. The mutation first looks for an
existing WorkspaceUser - by workspaceUser.id, or by matching
workspaceUser.user.email or workspaceUser.userId within
workspaceUser.workspaceId. If none exists, a membership is created
exactly like createWorkspaceUser, inviting a brand-new user by
email when needed. If one exists and the caller may manage it
(workspace admin or organization admin), it is updated like
updateWorkspaceUser; if the caller may only view the workspace, the
existing record is returned unchanged instead of erroring.
See createWorkspaceUser for the input semantics, the optional
todoId/projectId/stackId/recipeId context arguments, the
allowed permissions values, and the per-organization user limit.
Returns the WorkspaceUser.
setProjectDot
Manually set the project's status dot (health indicator) to green,
yellow, or red. Pie normally maintains the dot automatically from
the project's open Issue and Risk posts: an open Issue makes it red,
an open Risk yellow, and it reverts to green once all are closed.
Setting the dot through this mutation records a manual override, and
from then on automatic updates are permanently disabled for the
project — no API re-enables them. Requires project update permission.
Returns the newly created status dot.
setProjectPriority
Set the project's priority integer, shown in Pie's report views. No
server-side range validation is applied. Requires project report
permission: workspace "admin" or "viewer" role, project
"admin"/"admin+autoassign" assignment, or stack admin. Returns the
updated project.
setProjectTodosProgresses
Bulk-sets the completion percentage of todos in one slice,
optionally narrowed to one box. Each todosProgresses item carries
a todo id and an integer progress from 0 to 100, or null for not
started; 100 means done. Every target must exist, be non-deleted and belong to sliceId
(and boxId when given). Missing, foreign or duplicate ids and
invalid progress reject the entire command. An empty list is a
no-op that returns stored aggregates.
Requires view access to the slice's project (not_found otherwise).
Requires project administration (including admin+autoassign),
workspace administration, or active assignment to every listed todo.
Pending assignments confer no write authority. A caller who is not an
administrator receives the same unauthorized error for a missing
target and for a target they cannot edit. Unauthorized batches fail
without changes.
Returns ProjectTodosProgressPayload with the recalculated project
progress and per-slice/per-box aggregates. todosProgresses contains
the saved values of the requested tasks only. Sending a parent as 0 or
100 also sets every same-box child, including children omitted from the
request; an explicit child value wins. Those children are not listed in
todosProgresses. When the batch touches a parent that has same-box
children, or one of those children, the parent's stored progress is
cleared. previousProgresses lists the progress every affected task had
before the change, children and cleared parents included. Pass undoToken
and the original requested targets to undo the change. Task changes and aggregate saves are atomic, and subscription
updates follow success. Unlike updateTodo, this path does not email
assignees of successor todos.
setTodosDependencies
Sets or clears a dependency chain across todos of one project. With
clear: false, ids is treated as an ordered chain: each todo's
predecessor list is replaced with exactly the previous todo in the
list (the first todo's existing predecessors are left untouched),
and dependent dates are recalculated down the chain. With
clear: true, all predecessors of the listed todos are removed. For
arbitrary, non-chain dependency graphs set todo.predecessors via
updateTodo instead.
Ids that do not belong to projectId are ignored. Requires edit
permission on the project, otherwise fails with not_allowed.
Returns the affected todos.
sliceTodos
Returns the tasks (Todos) in the given Project-Slices that the calling user is permitted to view. Visibility follows the parent Project's access rule: the user must be a workspace admin or viewer, or a workspace member with an assignment to the Project (or a stack_admin role on its parent Stack). Slice ids belonging to Projects the user cannot view — or to deleted Slices or Projects — are silently omitted from the result rather than raising an error.
A user holding the "only_my_work" role on a Project receives only
the tasks assigned to them, plus parent tasks of their assigned
subtasks — the same scope they see on the Project board. An
Organization Access Token receives every task in the Slices.
Soft-deleted tasks are excluded; completed tasks are included
(filter client-side on progress if you only want open work).
Slice ids from different Projects may be mixed in a single call;
the response is a flat [Todo] list across Projects. Group results
after the fact via each Todo's sliceId (or slice { projectId }
for the parent Project). No ordering is guaranteed — sort
client-side on the position field if a stable order is needed.
Use this query for the task lists of specific Slices; use projectTodos for the full task list of a Project. This query is for Project-Slices only; Recipe-Slice contents are retrieved through the Recipe type.
todo
Returns a single Todo by id, if the calling user is permitted to view it. A Todo is a task in Pie's model — the unit of work that can be assigned to one or more users, placed inside a Box on a Project board (or directly at the Project level when the Project has no Slices), associated with a parent Todo as a subtask, given start and due dates, given estimated and planned work effort, tagged with one or more ColorTags, and tracked for time.
Use this query when the caller has a Todo id (from a list query like projectTodos, sliceTodos, ompTodos, or projectsTodos) and needs the full detail of that one Todo. When the calling user is not permitted to view the Todo, or no Todo has the given id, the query returns null rather than an error.
See projectTodos for the full task list of a Project, sliceTodos for the task list of one or more Project-Slices, and recipeTodo for the equivalent query on a Recipe template.
undoDeleteBox
Restores a box that was soft-deleted via deleteBox with
deleteTodos: true, together with the todos soft-deleted in the
same operation (matched by the box's deletion timestamp). Boxes
deleted with deleteTodos: false were removed permanently and
cannot be restored. Requires permission to create todos in the
box's project. Returns the restored Box.
undoDeleteSlice
Restore a slice previously removed with deleteSlice. The slice
itself is always restored; in addition, exactly the boxes listed in
boxIds and the tasks listed in todoIds are restored, so pass back
the ids affected by the original deleteSlice call. Both lists are
required in practice — use empty lists to restore the slice alone.
The deleteTodos, deleteSlice, and deleteBoxes arguments are
accepted for symmetry with deleteSlice but ignored. Requires the
same permission as deleteSlice. Returns the restored slice.
undoDeleteTodo
Restores a soft-deleted todo and its subtasks by clearing their
deletedAt. There is no time limit on restoring; a Jira link
cleared by deleteTodo is not re-established. Permission matches
updateTodo; inaccessible or unknown ids fail with not_found.
Returns TodoMutationPayload with the restored todo and
recalculated progress aggregates.
updateAssignment
Update an existing assignment. Pass the assignment's id in
assignment.id (as a string) plus the fields to change: role,
hourlyBillingRate, hourlyInternalRate, plannedHours,
workEffort, workEffortCustomized, redistributed. The
assignment's userId and target (todoId, projectId, stackId)
cannot be changed; delete and recreate instead. The pending flag is
not updatable here; use approveAssignment or denyAssignment.
Updating a project todo assignment also syncs the rate overrides onto
the user's project-level assignment (returned as
projectAssignment); plannedHours stays per-todo. Role changes are
validated with the same rules as createAssignment. Changing
workEffort marks the assignment as customized and triggers
recalculation of the todo's total work effort and planned time.
Access control: workspace admins, project admins ("admin" or
"admin+autoassign"), or, for todo assignments, any user assigned to
that todo. Returns AssignmentResult with assignmentId and
projectAssignment; not-found, access, and validation failures
return an unprocessable_entity error.
updateBox
Updates a box's title, description, done flag, and
markedDoneAt timestamp. Structural position is not handled here:
use reorderBoxes or moveBox to reposition a box, and
moveBoxToDoneSlice for the done-sprint flow.
done is one-way through this mutation: done: true marks the box
as the slice's "Done" column and automatically clears done on
every other box in the same slice (at most one done box per slice);
done: false or omitting the argument leaves the current value
unchanged, so done cannot be unset here. Todos moved or copied
into a done box get their progress set to 100. markedDoneAt
likewise can only be set, not cleared.
Access control matches createBox (permission to create todos in
the box's project). Returns the updated Box; fails with
not_allowed when the caller lacks permission.
updateColorTag
Renames a ColorTag. id is the ColorTag id and name the new
label; the tag's color and its existing associations to tasks
are unchanged. Works for both Project-scoped and Recipe-scoped
tags, color and text variants alike, but the special Milestone
tag cannot be renamed.
There is no createColorTag mutation, so renaming the entries
seeded by createDefaultColorTags is how the color set is
customized. Requires update permission on the owning Project
(Project Admin, Stack Admin, or Workspace Admin) or Recipe.
Returns the updated ColorTag; fails with not_allowed
otherwise.
updatePost
Updates an existing Post. Mutable fields are title, content,
secondaryType, priority, open, and ownerId; omitted
optional arguments are left unchanged. content is plain text.
HTML is not rendered (tags would show up as literal text).
A Post's type, its thread parent, and its container cannot be
changed after creation. open is required on every call — pass
the current value when not changing it; open: false records the close
timestamp internally. Changing ownerId emails the new owner.
Permitted callers: the Post's author, its current owner, anyone
with update permission on the Post's Project (Project Admin,
Stack Admin, or Workspace Admin), or — for Recipe-side Posts —
anyone with access to the Recipe. Returns the updated Post.
id is required at runtime despite the nullable schema typing.
updateProject
Update an existing project. title and workspaceId are required on
every call even when unchanged — pass the project's current values
when changing other fields. Writable fields: title, description,
workspaceId, stackId, closed, closedStatus, tags,
startDate, and endDate. recipeId is accepted for compatibility
but ignored: a project's recipe link cannot be changed after creation.
Passing a different workspaceId moves the project to that workspace
(allowed only into workspaces where the caller can create projects);
the project's tasks move along with it and assignees are added to the
target workspace as needed. stackId must reference a stack in the
project's (target) workspace. closed and closedStatus are stored
independently; keep them consistent (for example
closedStatus: "closed" together with closed: true). title must
not contain a URL.
Requires project update permission: workspace "admin" role, project
"admin"/"admin+autoassign" assignment, or "stack_admin" on the
project's stack. The returned project object carries only id and
workspaceId; re-query project to read the full updated state. For
single-field changes prefer the dedicated mutations:
updateProjectEndDate, updateProjectTotalBudget,
updateProjectDataFields, updateProjectSharing, setProjectDot,
setProjectPriority.
updateProjectBox
Set or clear the unneeded flag on a project box. An unneeded box is
treated as done and excluded from project progress; passing false
restores it. Project progress is recalculated after the change.
Requires project update permission. Returns the parent project, not
the box. For other box fields use updateBox.
updateProjectEndDate
Update only the endDate of a project; all other fields are
preserved. Pass null to clear the date. Requires project update
permission. Returns the updated project. Use updateProject for
multi-field changes.
updateProjectPropagateDependencies
Toggle the project's propagateDependencies flag. When true,
changing a task's dates automatically recalculates the dates of its
dependent (successor) tasks along the project's dependency chains;
when false, date changes never shift other tasks. Requires project
update permission (workspace "admin", project
"admin"/"admin+autoassign", or stack admin). Returns the updated
project.
updateProjectSlice
Update runtime attributes of a single project slice. unneeded: true
marks the slice as not needed so it is treated as done and excluded
from project progress; false reverses it. order sets the sort
direction ("asc" or "desc") applied to the slice's boxes. progress
writes the slice progress value directly; progress aggregates are
recalculated after the update. Requires project update permission.
Returns the parent project, not the slice. To rename, reorder, create,
or delete slices use saveProjectSlices and deleteSlice.
updateStack
Updates a Stack identified by id. This is a full-state update:
title and workspaceId are required on every call, and the
optional description and closed values are written as given —
omitting them clears the stored values — so always resend the
current values you want to keep.
Passing a different workspaceId moves the Stack to that
Workspace and reassigns every Project in the Stack to the new
Workspace in the same operation. Setting closed: true marks the
Stack as done/archived for list views; setting closed: false
reopens it.
The calling user must be an admin of the Stack's Workspace or a
Stack admin assigned to the Stack; otherwise the mutation fails
with "not_allowed" ("not_found" for an unknown id). Returns the
updated Stack. Stack Admin assignments cannot be changed here —
they are only settable at creation via createStack.
updateTimeEntry
Overwrites the actual-time value (seconds) of an existing
TimeEntry. Pass the TimeEntry id and the new seconds; the
previous value is replaced, not accumulated, and seconds: 0
keeps the entry with a zero value rather than deleting it. This
mutation edits the actual track only — use
updateTimeEntryPlanned for the planned track.
Without userId the entry's parent row must belong to the
calling user. Pass userId to edit another user's entry; the
caller must be that user (with view access to the Todo on a Todo row), someone
with update permission on the Project (Project Admin, Stack Admin, or
Workspace Admin) on a Todo or Project row, or an admin of the
organization on a Non-Project Activity row. Returns the updated TimeEntry.
updateTimeEntryPlanned
Planned-track counterpart of updateTimeEntry, for entries on
Todo-backed Timesheet rows. userId is required at runtime
despite the nullable schema typing. With planned: true the
entry's plannedSeconds is overwritten; passing planned: true
with seconds omitted flags the entry as redistributed so its
planned value is recomputed from the Todo's work-effort
distribution. If planned is omitted, the entry's actual
seconds is updated instead.
When the entry's date falls inside the Todo's start–due range,
planned effort is recalculated across the Todo and every
affected Timesheet row is returned; otherwise only the parent
row is returned. The return type is [TimeItem], not the
updated TimeEntry.
The caller must be the row's owner (their own userId, with
view access to the Todo) or have update permission on the Todo's
Project (Project Admin, Stack Admin, or Workspace Admin).
updateTimeItem
Updates an existing Timesheet row. tags is the only mutable
field: it replaces the row's organization reporting labels (new
tag names are also added to the organization's tag list). The
row's target, week, and owner cannot be changed — delete the row
and create a new one instead. Day-cell hours are edited with
updateTimeEntry or updateTimeEntryPlanned, not here.
Without userId the mutation targets the calling user's own
row. Pass userId to edit a row on another user's timesheet; the
caller must be that user (with view access to the Todo on a Todo row), someone
with update permission on the Project (Project Admin, Stack Admin, or
Workspace Admin) on a Todo or Project row, or an admin of the
organization on a Non-Project Activity row. Returns the updated TimeItem; unauthorized
calls fail with not_allowed.
updateTodo
Updates an existing todo. id selects the todo; todo carries the
changes - only the provided input fields are written, but
todo.title is required by the input type, so pass the current
title when not changing it. Likewise pass the current position,
otherwise the todo is re-sorted to the end of its slice. The caller
must be a workspace admin, a project admin, or assigned to the todo
(for standalone todos: assigned to it or admin of the personal
workspace); inaccessible or unknown ids fail with not_found.
Structural rules: changing sliceId/boxId moves the todo and its
subtasks; the box must belong to the target slice; workspaceId
cannot be changed; jiraId can only be set while previously null.
When a todo with subtasks receives progress, date, duration, or
location changes, its own dates, duration, and progress are cleared
(derived from subtasks), and setting progress to 0 or 100 on such
a parent cascades that value to all subtasks. Side effects: setting
progress to 100 emails assignees of dependent (successor) todos; a
due-date change by a non-admin notifies project admins (subject to
their notification settings); snoozeDate is stored per calling
user, not on the shared todo.
Returns TodoMutationPayload with the updated todo, affected
parentTodo and subtasks, and recalculated progress, slices,
and boxes. Prefer moveTodos for relocating several todos at once
and setProjectTodosProgresses for bulk progress updates.
updateTodoChecklist
Replaces a todo's checklist wholesale. checklist is the full
desired list of items (title plus optional done flag); items
have no ids and are stored positionally, so send every item you want
to keep - omitted items are removed. The caller needs permission to update
the todo. Checklists are available on standalone todos and on
project todos; otherwise the mutation fails with not_allowed. Returns the updated Todo.
updateTodosDates
Bulk-updates start and due dates of todos in one project. Each
todos item carries a todo id plus the new startDate and
dueDate; both values are written exactly as given, so omitting one
clears that date. Every id must be a todo of projectId that the
caller is permitted to update (including the "only_my_work" restriction);
a duplicate, unauthorized, or other-project id rejects the entire request
with no changes.
Dependent (successor) todos are not rescheduled by this mutation,
and unlike updateTodo it does not expand the project's date range;
the project's late status is recalculated. Returns the todos that
were actually updated.
viewedPosts
Records that the calling user has seen the Posts in ids,
clearing their unread indicators. Receipts are per-user;
already-viewed ids are skipped, so the call is idempotent, and
there is no un-view operation. Returns the NothingToReturn
placeholder — a non-error response means success.
Role
RootQueryType
